CASE STUDY

Steep Roof

THE CHALLENGE

Valero’s storage facility, an “A-Frame” structure with a 45-degree sloped roof, needed a new roof and secondary framing. Our first challenge was how to access the roof to remove the existing metal roof.

The SCOPE

40,000 SF

of fiberglass roof panels

8,000 LF

of corrosive resistant fiberglass purlins

The outcome

We engineered and fabricated a custom platform to access the structure and haul away the old roof. In order to safely work on the steep sloped roof with high wind conditions, we developed a rolling work basket that allowed our crew to work on a level surface while installing the new roof.

Other Case Studies

csm industrial project at turk power plant

Maximum Safety

CB&I (Shaw) hired CSM for the cladding scope of a new coal powered power plant. Numerous trades had to work together to complete this project ...
example of difficult access project with csm industrial products

Difficult Access

BASF expansion in Geismar, LA needed metail roofing, siding and insulation with extremely difficult access to the structure due to nearby cable trays and piping.
Scroll to Top